Road construction is underway from the Omid Sabz settlement to the Erfani road. The road construction from the Omid Sabz settlement to the Erfani road, along with its connecting road to Qala-ye Qazi in the jurisdiction of District Thirteen, is ongoing and sections of this road are expected to be ready for asphalt surfacing soon. The main road from the Omid Sabz settlement to the Erfani road is 3,834 meters long and 45 meters wide, and its connecting road to Qala-ye Qazi, along the circular road, is 1,146 meters long and 20 meters wide. It includes the construction of water channels, sidewalks, flower pots, the installation of streetlights, road markings, and other components of a standard road. With the completion of this project, the ground for economic growth in the surrounding areas will be further prepared, and significant ease will be created for citizen mobility. #Kabul_Step_by_Step_Towards_Development Citizen, Cooperation, Municipality ساخت سرک از شهرک امید سبز تا سرک عرفانی جریان دارد ساخت سرک از شهرک امید سبز تا سرک عرفانی همراه با سرک ارتباطی آن تا قلعه قاضی در مربوطات ناحیه سیزدهم جریان داشته و قرار است قسمت‌های این سرک به‌زودی آماده به قیرریزی گردد. سرک اصلی از شهرک امید سبز الی سرک عرفانی به‌طول ۳۸۳۴ متر و عرض ۴۵ متر، و سرک ارتباطی آن تا قلعه قاضی در مسیر سرک حلقوی به‌طول ۱۱۴۶ متر و عرض ۲۰ متر بوده که شامل اعمار آب‌روها، پیاده‌روها، گلدان‌ها، نصب چراغ‌های تنویر، خط‌اندازی جاده و سایر اجزای یک سرک معیاری است. با تکمیل این پروژه، زمینه برای رشد اقتصادی ساحات بیش‌ از پیش فراهم شده و سهولت‌های گسترده در رفت‌وآمد شهروندان ایجاد خواهد شد. _______ له امید سبز ښارګوټي څخه تر عرفاني سړک پورې د سړک جوړولو چارې روانې دي د دیارلسمې ناحیې اړوند له امید سبز ښارګوټي څخه تر عرفاني سړک او پر دوام یې تر قلعه قاضي پورې د سړک جوړولو چارې روانې دي او ځیني برخې به یې ډېر ژر قیر کولو ته چمتو شي. دغه سړک چې، له امید سبز ښارګوټي څخه تر عرفاني سړک پورې ۳۸۳۴ متره اوږدوالی، ۴۵ متره سور او پر دوام یې تر قلعه قاضي ( حلقوي سړک) پورې ۱۱۴۶ متره اوږدوالی او ۲۰ متره سور لري ، د لښتیو، پلیو لارو، ګلدانونو، څراغونو، په سړک د کرښو اچولو او د یوه معیاري سړک د نورو جزئیاتو په ګډون به په اساسي توګه جوړ او ورسره جوخت به له یوې خوا د سیمو اقتصادي ودې ته زمینه برابره او بله خوا به ښاریانو ته د تګ راتګ په برخه کې ګڼې آسانتیاوې رامنځته شي. #کابل_ګام_په_ګام_د_آبادۍ_په_لور همشهری،همکاری، شاروالی #کابل_ښاروالۍ #شاروالی_کابل #Kabul_municipality Source: Kabul Municipality / کابل ښاروالۍ / شاروالی کابل (@KblMunicipality) [ https://x.com/KblMunicipality/status/2046827466010878034 ] #Afghanistan #Kabul
0
0
0
0
Notification Regarding the Malali Four-Way Intersection to Sixty-Meter Road Project To facilitate the process of constructing and developing the road from the Malali (Bet-Khak) four-way intersection to the Sixty-Meter Road in the Ghermez Sabeq area, an awareness program was held for residents along the route in the Twenty-Second District. At the program, Engineer Mohammad Dawood, Head of the Twenty-Second District, emphasized the importance of this route as a key economic corridor in the southeastern zone of Kabul city. He urged landowners of properties subject to expropriation to promptly submit their documents to Kabul Municipality to proceed with the legal procedures and to cooperate in clearing the route and removing obstacles. Furthermore, Mohammad Yasin "Amin," Director of Public Awareness at the Publications and Public Awareness Department, and Engineer Mohammad Tameem "Sahbzadeh," employee of the Expropriation Department, emphasized that the construction of this road would play a valuable role in the economic and social development of the relevant areas and would provide greater convenience for citizens traveling between the southern and eastern provinces and Kabul. According to the information provided, 299 properties are subject to expropriation along the route of this project, and in accordance with the law, compensation will be paid to the owners. It should be noted that this road will be constructed according to the design of the Urban Infrastructure Department of Kabul Municipality, with a length of 6.5 kilometers and a width of 60 meters, in a standard and fundamental manner. Meanwhile, Haji Momin Khan, Chairman of the Pass Council of the Twenty-Second District, along with local representatives, welcomed the implementation of this development project and pledged to cooperate fully with Kabul Municipality in its execution. #Kabul_Step_by_Step_Towards_Habitability Citizen, Cooperation, Municipality #Kabul_Municipality #Kabul_Municipality آگاهی‌دهی برای تطبیق پروژهٔ سرک چهارراهی ملالی الی سرک شصت‌متره لته‌بند به‌ منظور تسهیل روند تطبیق پروژهٔ ساخت و توسعهٔ سرک از چهارراهی ملالی (بت‌خاک) الی سرک شصت‌متره لته‌بند در ساحهٔ گمرک سابقه، برای باشندگان مسیر این سرک در مربوطات ناحیهٔ بیست‌ودوم برنامهٔ آگاهی‌دهی برگزار گردید. در این برنامه، انجنیر محمد داود، رئیس ناحیهٔ بیست‌ودوم با اشاره به اهمیت این مسیر به‌عنوان یکی از دهلیزهای مهم اقتصادی در زون جنوب‌شرق شهر کابل، از مالکان ملکیت‌های شامل استملاک خواست تا جهت طی مراحل قانونی اسنادشان به‌موقع به شاروالی کابل مراجعه نموده و در پاک‌سازی مسیر و رفع موانع، همکاری لازم انجام دهند. همچنان، محمد یاسین «امین» آمر آگاهی‌دهی ریاست نشرات و آگاهی عامه و انجنیر محمد تمیم «صاحب‌زاده» کارمند ریاست استملاک، تأکید کردند که اعمار این سرک نقش ارزنده‌ای در رشد اقتصادی و اجتماعی ساحات مربوطه داشته و سهولت‌های بیشتری را برای شهروندانی که از ولایات جنوب و شرق به کابل رفت‌وآمد می‌کنند، فراهم خواهد ساخت. براساس معلومات ارائه‌شده، در مسیر این پروژه ۲۹۹ ملکیت شامل استملاک بوده که مطابق قانون، بدیل آن به مالکان پرداخت می‌گردد. قابل یادآوری است که این سرک بر بنیاد دیزاین ریاست زیربناهای شهری شاروالی کابل، به‌طول ۶.۵ کیلومتر و عرض ۶۰ متر به‌گونهٔ معیاری و اساسی اعمار خواهد شد. در همین حال، حاجی مؤمن‌خان، رئیس شورای وکلای گذر ناحیهٔ بیست‌ودوم، همراه با نمایندگان اهالی، از تطبیق این پروژهٔ توسعوی استقبال نموده و تعهد سپردند که در اجرای آن با شاروالی کابل همکاری همه‌جانبه خواهند داشت. _______ له ملالۍ څلورلارې څخه د لته بند تر شپېته متره سړک پورې د نوي سړک په اړه پوهاوی ورکړل شو د کابل ښار په جنوب ختیځ زون کې د دوه ویشتمې ناحیې اړوند له ملالۍ (بت‌خاک) څلورلارې څخه د لته ‌بند تر شپېته متره سړک پورې د نوي سړک د جوړولو او پراختیا په اړه د دې سړک په اوږدو کې میشتو ښاریانو ته پوهاوی ورکړل شو. په دې برنامه کې د دوه ‌ویشتمې ناحیې رئیس انجنیر محمد داود د یاد سړک د اهمیت په اړه معلومات وړاندې کړل او ویې ویل چې، دغه سړک د کابل ښار په جنوب ختیځ زون کې له مهمو اقتصادي دهلېزونو څخه شمېرل کېږي. نوموړي د استملاکي ملکیتونو له مالکانو وغوښتل چې، د خپلو قانوني سندونو داداري پړاونو د بشپړولو په موخه هر څه ژر کابل ښاروالۍ ته مراجعه وکړي او د خنډونو د پاکولو په برخه کې همکار و اوسي. ورته مهال د خپرونو او عامه پوهاوي ریاست د عامه پوهاوي آمر محمد یاسین امین او د استملاک ریاست کارکوونکي انجنیر محمد تمیم صاحب‌زاده په خپلو خبرو کې ټینګار وکړ چې، د دې سړک جوړول به له یوې خوا د اړوندو سیمو په اقتصادي او ټولنیز پرمختګ کې مهم رول ولوبوي او بله خوا به د جنوب ختیځ زون اوسېدونکو ته ګڼې آسانتیاوې رامنځته شي. د معلوماتو له مخې؛ د دې سړک په اوږدو کې ۲۹۹ ملکیتونه تر استملاک لاندې دي چې، د کړنلارې او اصولو له مخې به یې مالکانو ته بدیل حقونه ورکړل شي. ټاکل شوې ده یاد سړک د کابل ښاروالۍ د ښاري زېربناوو ریاست د ډیزاین له مخې، د ۶.۵ کیلومترو په اوږدوالي او ۶۰ مترو په سور سره په معیاري او اساسي توګه جوړ شي. د دوه ویشتمې ناحیې د ګذر وکیلانو د شورا رئیس حاجي مؤمن خان د سیمې د اوسېدونکو په استازیتوب د دې پراختیايي پروژې له پلي کېدو هرکلی وکړ او ژمنه یې وکړه چې، د پلي کېدو په برخه کې به یې له کابل ښاروالۍ سره هر اړخیزه مرسته وکړي. #کابل_ګام_په_ګام_د_آبادۍ_په_لور همشهری،همکاری، #Afghanistan #Kabul
0
1
0
0
Continuation of construction of the first section of the Begram–Lataband road to the Kabul–Jalalabad road. #Kabul_Step_by_Step_Towards_Civilization Citizen, Cooperation, Municipality #Kabul_Municipality #Kabul_Municipality #Kabul_municipality ادامه ساخت بخش اول سرک بگرامی–لته‌بند الی سرک کابل–جلال‌آباد #کابل_ګام_په_ګام_د_آبادۍ_په_لور همشهری،همکاری، شاروالی #کابل_ښاروالۍ #شاروالی_کابل #Kabul_municipality Source: Kabul Municipality / کابل ښاروالۍ / شاروالی کابل (@KblMunicipality) [ https://x.com/KblMunicipality/status/2039326916793274539 ] #Afghanistan #Kabul
0
0
0
0
To facilitate travel for city residents, the Security Project Road was connected to the roads of Qala-e Zamaan Khan and the second block of Ahmad Shah Baba Mina, related to the twelfth district. This action will play a significant role in reducing congestion and distributing traffic flow in the relevant areas. The connecting road from the Security Project Road to the second block of Ahmad Shah Baba Mina is 728 meters long and 40 meters wide, while the road from the Security Project Road to Qala-e Zamaan Khan is 730 meters long and 30 meters wide, both constructed with all the details of a standard road. These roads, considered among Kabul's major thoroughfares, have been fundamentally built in recent years according to technical standards by the Kabul Municipality. The Kabul Municipality requests that residents pay attention to the preservation of public facilities, especially the newly constructed roads. The Security Project Road connects to Qala-e Zamaan and Gulai blocks 2 of Ahmad Shah Baba Mina. The Security Project Road has been connected to the roads of Qala-e Zamaan and Gulai blocks 2 of Ahmad Shah Baba Mina in the twelfth district, which has proven effective in reducing congestion and distributing heavy traffic volume on adjacent roads. The road connecting from Gulai blocks 2 of Ahmad Shah Baba Mina to the Security Project Road is 728 meters long and 40 meters wide, and the continuation of the Security Project Road that connects to Qala-e Zamaan is 730 meters long and 30 meters wide, encompassing all the details of a standard urban road. These roads are considered among the important and strategic routes and have been constructed in recent years by the Kabul Municipality, according to technical and engineering standards. The Kabul Municipality requests that citizens pay close attention to the preservation and maintenance of urban facilities, especially newly constructed roads. #Kabul_Step_by_Step_Towards_Development Citizen, Cooperation, Municipality #Kabul_Municipality #Kabul_Municipality د امنیت پروژې سړک د قلعه زمان خان او د احمدشاه بابا مېنې د دویم بلاک له سړکونو سره ونښلول شو ښاریانو ته د تګ راتګ په برخه کې د آسانتیاوو رامنځته کولو په موخه، د امنیت پروژې سړک د قلعه زمان خان او د دولسمې ناحیې اړوند د احمدشاه بابا مېنې د دویم بلاک له سړکونو سره ونښلول شو، چې دغه اقدام د ګڼه ګوڼې د کمښت او د اړوند سیمو ترافیکي بهیر د ویش په برخه کې مهم رول لري . د امنیت پروژې له سړک څخه د احمد شاه بابا مینې د دویم بلاک تر سړک پورې نښلوونکی سړک ۷۲۸ متره اوږدوالی او ۴۰ متره سور او له امنیت پروژې څخه تر قلعه زمان خان پورې سړک ۷۳۰ متره اوږدوالی او ۳۰ متره سور لري چې، د یوه معیاري سړک د ټولو جزئیاتو په ګډون جوړ شوي دي. یاد سړکونه چې د کابل ښار له مهمو سړکونو څخه شمېرل کېږي، په وروستیو کلونو کې د کابل ښاروالۍ له خوا د تخنیکي معیارونو مطابق په اساسي توګه جوړ شوي دي. کابل ښاروالۍ له ښاریانو غوښتنه کوي چې، د عامه ښاري تاسیساتو په ځانګړې توګه د نویو جوړو شویو سړکونو ساتنې ته پام وکړي. _______ وصل سرک پروژه امنیت به سرک قلعه‌زمان و گولایی بلاک دوم احمدشاه بابا مینه سرک عمومی پروژهٔ امنیت به سرک قلعه‌زمان و گولایی بلاک دوم احمدشاه بابا مینه در مربوطات ناحیه دوازدهم وصل گردیده که این اقدام در کاهش ازدحام و تقسیم حجم سنگین ترافیک در سرک‌های همجوار، مؤثر واقع شده است. سرک گولایی بلاک دوم احمدشاه بابا مینه از سرک پروژهٔ امنیت، به‌طول ۷۲۸ متر و عرض ۴۰ متر و همچنان ادامهٔ سرک پروژهٔ امنیت که به سرک قلعه‌زمان وصل می‌گردد، به‌طول ۷۳۰ متر و عرض ۳۰ متر، شامل تمامی جزئیات یک سرک معیاری شهری می‌باشد. این سرک‌ها از جمله مسیرهای مهم و استراتیژیک به‌شمار می‌روند که در سال‌های اخیر از سوی شاروالی کابل، مطابق معیارهای تخنیکی و فنی اعمار گردیده‌اند. شاروالی کابل از شهروندان تقاضا می‌نماید تا در حفظ و نگهداری تأسیسات شهری، به‌ ویژه سرک‌های نوساخت، توجه جدی داشته باشند. #کابل_ګام_په_ګام_د_آبادۍ_په_لور همشهری،همکاری، شاروالی #کابل_ښاروالۍ #شاروالی_کابل #Kabul_municipality Source: Kabul Municipality / کابل ښاروالۍ / شاروالی کابل (@KblMunicipality) [ https://x.com/KblMunicipality/status/2038605915482415303 ] #Afghanistan #Kabul
0
0
0
0
Progress on the Alauddin-Char Qala Road Connection. #Kabul_Step_by_Step_Towards_Urbanization Citizen, Cooperation, Municipality #Kabul_Municipality #Kabul_Municipality #Kabul_municipality پیشرفت کار سرک اتصالی علاءالدین–چهارقلعه چهاردهی #کابل_ګام_په_ګام_د_آبادۍ_په_لور همشهری،همکاری، شاروالی #کابل_ښاروالۍ #شاروالی_کابل #Kabul_municipality Source: Kabul Municipality / کابل ښاروالۍ / شاروالی کابل (@KblMunicipality) [ https://x.com/KblMunicipality/status/2037919292251836435 ] #Afghanistan #Kabul
0
0
0
0
Construction of the Alauddin-Chahar Qala Road connecting Fourteenhi is progressing. Construction work on the connecting road from the Alauddin three-way intersection to the Chahar Qala road in Fourteenhi, within District Six, is proceeding systematically and according to plan. This project is an important urban initiative being implemented to improve accessibility and reduce traffic congestion in the area. The road, with a length of 1,902 meters and a width of 20 meters, is designed to include drainage systems, sidewalks, median planters, lighting systems, and other standard road features. With the completion of this road, residents of western Kabul will experience significant improvements in mobility. It is also expected that the completion of this project will create an environment for economic growth and development in the areas of Karteh Seh, Chahar Qala Fourteenhi, and Alauddin. #Kabul_Step_by_Step_Towards_Urbanization له علاءالدین درې لارې څخه د چهاردهي تر چهار قلعه پورې سړک ښه کاري پرمختګ لري د شپږمې ناحیې اړوند د علاءالدین له درې لارې څخه د چهاردهي تر چهار قلعه پورې د نوي نښلوونکي سړک د جوړولو عملي چارې د پلان له مخې په منظمه توګه روانې دي. دغه پروژه یوه مهمه ښاري پروژه ده چې، د ترافیکي ګڼه ګوڼې د کمښت په موخه د پلي کېدو په حال کې ده. یاد سړک چې ۱۹۰۲ متره اوږدوالی او ۲۰ متره سور لري، د لښتیو، پلیو لارو، ګلدانونو، څراغونو او د یوه معیاري سړک د نورو جزئیاتو په ګډون ډیزاین شوی دی. د دې سړک په جوړېدو سره به د کابل د لوېدیځ زون اوسېدونکو ته د تګ راتګ په برخه کې ګڼې آسانتیاوې رامنځته شي. له بل لوري اټکل کېږي چې، د دې پروژې په بشپړېدو سره به د علاءالدین، کارته سه او د چهاردهي د چهارقلعه سیمو پرمختیايي او اقتصادي ودې ته زمینه برابره شي. ______ پیشرفت کار سرک اتصالی علاءالدین–چهارقلعه چهاردهی کارهای زیربنایی سرک اتصالی میان سه‌راهی علاءالدین و سرک چهارقلعهٔ چهاردهی در مربوطات ناحیهٔ ششم شهر، به‌صورت منظم و طبق برنامه ادامه دارد. این پروژه یکی از طرح‌های مهم شهری به‌شمار می‌رود که با هدف بهبود دسترسی و کاهش ازدحام ترافیکی در این مسیر روی دست گرفته شده است. سرک مذکور به‌طول ۱٬۹۰۲ متر و عرض ۲۰ متر طراحی گردیده و شامل اعمار آب‌روها، پیاده‌روها، گلدان‌های وسط سرک، نصب سیستم تنویر و اجرای خط‌اندازی ترافیکی می‌باشد. با تکمیل این مسیر، رفت‌وآمد شهروندان در ساحات پررفت‌وآمد زون غرب شهر به‌ گونهٔ چشم‌گیر آسان خواهد شد. از سوی دیگر، انتظار می‌رود با بهره‌برداری از این سرک، زمینه برای رشد فعالیت‌های اقتصادی و انکشافی در مناطق کارته‌سه، چهارقلعهٔ چهاردهی و علاءالدین بیش از پیش فراهم گردد. #کابل_ګام_په_ګام_د_آبادۍ_په_لور همشهری،همکاری، شاروالی #کابل_ښاروالۍ #شاروالی_کابل #Kabul_municipality Source: Kabul Municipality / کابل ښاروالۍ / شاروالی کابل (@KblMunicipality) [ https://x.com/KblMunicipality/status/2037847050788687937 ] #Afghanistan #Kabul
0
0
0
0
Construction of an aerial tramway in front of the Kabul provincial administration building is progressing rapidly. #Kabul_Step_by_Step_Towards_Development Citizen, Cooperation, Municipality #Kabul_Municipality #Kabul_Municipality #Kabul_municipality د کابل ولایت مقام د اداري ودانۍ مخې ته د هوايي پله د جوړولو چارې په چټکۍ سره روانې دي #کابل_ګام_په_ګام_د_آبادۍ_په_لور همشهری،همکاری، شاروالی #کابل_ښاروالۍ #شاروالی_کابل #Kabul_municipality Source: Kabul Municipality / کابل ښاروالۍ / شاروالی کابل (@KblMunicipality) [ https://x.com/KblMunicipality/status/2036375463623282987 ] #Afghanistan #Kabul
0
0
0
0
The opening of connecting roads between Parwan Third – Badam Bagh – Pol-e-Teknik: A step towards reducing congestion The new connecting roads between the Parwan Third intersection and Badam Bagh, and continuing from Badam Bagh to the Pol-e-Teknik pass (which is also an alternative route to the Berekhi intersection), have been completed and opened. These newly constructed roads have divided the heavy traffic volume and significantly eased passage for citizens. The 560-meter road from Parwan Third to Badam Bagh and the new 900-meter road from Badam Bagh to the Pol-e-Teknik pass are among the new roads built by the Kabul Municipality in recent years. These roads connect the fourth, fifth, and seventeenth districts and are considered important and vital roads for the city of Kabul. The Kabul Municipality is committed to constructing similar roads in various parts of the city to reduce congestion and prevent traffic bottlenecks. --- Connecting roads from Parwan Three to Badam Bagh and the Pol-e-Teknik pass are alternative routes to the Berekhi intersection. The new roads connecting from the Parwan Three intersection to Badam Bagh and continuing to the Pol-e-Teknik pass serve as alternative routes to the Berekhi intersection. Their construction has diverted traffic and provided ease of movement for citizens. The road from Parwan Three to Badam Bagh is 560 meters long, and the new road from Badam Bagh to the Pol-e-Teknik pass is 900 meters long, both constructed by the Kabul Municipality in recent years. These roads connect the fourth, fifth, and seventeenth districts and play an important role in reducing traffic congestion. The Kabul Municipality is determined to construct similar roads to expand transportation infrastructure and reduce traffic congestion in Kabul city. #Kabul_Step_by_Step_Towards_Development Citizen, Cooperation, Municipality #Kabul_Municipality #Kabul_Municipality بهره‌برداری از سرک‌های اتصالی پروان سوم–بادام‌باغ–پولی‌تخنیک؛ گامی در کاهش ازدحام سرک‌های جدید اتصالی میان چهارراهی پروان سوم الی بادام‌باغ و همچنان از سرک بادام‌باغ الی گردنه پولی‌تخنیک که یکی از راه‌های بدیل چهارراهی بره‌کی نیز محسوب می‌شود، تکمیل و بهره‌برداری این سرک‌های نوساخت باعث تقسیم حجم سنگین ترافیک گردیده و برای عبور و مرور شهروندان، سهولت‌های چشم‌گیری فراهم کرده است. سرک پروان سوم الی بادام‌باغ به‌طول ۵۶۰ متر و سرک جدید بادام‌باغ تا گردنه پولی‌تخنیک به‌طول ۹۰۰ متر از جمله سرک‌های جدیدی هستند که از سوی شاروالی کابل در سال‌های اخیر اعمار گردیده است. این سرک‌ها نقطه وصل نواحی چهارم، پنجم و هفدهم بوده و از جمله سرک‌های مهم و حیاتی شهر کابل محسوب می‌شوند. شاروالی کابل مصمم است تا به‌ منظور کاهش ازدحام و جلوگیری از گره‌های کور ترافیکی در نقاط مختلف شهر، سرک‌های مشابه را نیز اعمار نماید. ________ له پروان سه څخه تر بادام باغ او د پولي تخنیک غره د لمنې نښلوونکي سړکونه د بره کي څلورلارې بدیلې لارې له پروان سه له څلورلارې څخه تر بادام باغ پورې او پر دوام یې د پولي تخنیک غره د لمنې نوي جوړ شوي سړکونه د بره کي څلورلارې بدیلې لارې ګڼل کېږي چې، په جوړېدو سره یې ترافیکي بهیر ویشل شوی او ښاریانو ته د تګ راتګ په برخه کې آسانتیاوې رامنځته شوې دي. له پروان سه څخه تر بادام باغ پورې سړک ۵۶۰ متره اوږدوالی او د پولي تخنیک غره د لمنې سړک ۹۰۰ متره اوږدوالی لري چې، په ورستیو کلونو کې د کابل ښاروالۍ له خوا جوړ شوي دي. دغه سړکونه چې، څلورمه، پنځمه او اوولسمه ناحیه یو له بل سره نښلوي، د ترافیکي ګڼه ګوڼې د کمښت په برخه کې مهم رول لري. کابل ښاروالۍ ژمنتیا لري چې، په کابل ښار کې د ترانسپورتي زیربناوو د پراختیا او د ترافیکي ګڼه ګوڼې د کمښت په موخه ورته نور سړکونه هم جوړ کړي. #کابل_ګام_په_ګام_د_آبادۍ_په_لور همشهری،همکاری، شاروالی #کابل_ښاروالۍ #شاروالی_کابل #Kabul_municipality Source: Kabul Municipality / کابل ښاروالۍ / شاروالی کابل (@KblMunicipality) [ https://x.com/KblMunicipality/status/2036345428136865892 ] #Afghanistan #Kabul #Parwan
1
0
1
0
Planting 2,000 saplings in the green belt of the Qasba area has begun. #Kabul_Step_by_Step_Towards_Development Citizen, Cooperation, Municipality #Kabul_Municipality #Kabul_Municipality #Kabul_municipality غرس ۲ هزار نهال در کمربند سبز ساحهٔ قصبه آغاز شد #کابل_ګام_په_ګام_د_آبادۍ_په_لور همشهری،همکاری، شاروالی #کابل_ښاروالۍ #شاروالی_کابل #Kabul_municipality Source: Kabul Municipality / کابل ښاروالۍ / شاروالی کابل (@KblMunicipality) [ https://x.com/KblMunicipality/status/2033889392339652957 ] #Afghanistan #Kabul
0
0
0
0
Work on the initial construction and development of Bagh Qazi Road has begun. #Kabul_Step_by_Step_Towards_Habitation Citizen, Cooperation, Municipality #Kabul_Municipality #Kabul_Municipality #Kabul_municipality د باغ قاضي سړک د جوړولو او پراختیا لومړنۍ چارې پیل شوې #کابل_ګام_په_ګام_د_آبادۍ_په_لور همشهری،همکاری، شاروالی #کابل_ښاروالۍ #شاروالی_کابل #Kabul_municipality Source: Kabul Municipality / کابل ښاروالۍ / شاروالی کابل (@KblMunicipality) [ https://x.com/KblMunicipality/status/2030999544524423432 ] #Afghanistan #Kabul
0
0
0
0
Excavation and leveling work on the challenging sections of the Pedole-Sang-e Nošte road are underway. Excavation of the mountain slopes and leveling of the challenging sections of the Pedole road, from the west of Khushal Khan High School No. 2 to the third Pedole project and finally to the Sang-e Nošte area in districts seven and twenty, is ongoing. These activities are being carried out to prepare the route for the construction of the road's foundational layers. According to the plan, the first section of this road, from the west of Khushal Khan High School No. 2 to the third Pedole project, will be 480 meters long and 40 meters wide, and the second section, from the third Pedole project to the Sang-e Nošte area, will be 3,300 meters long and 15.3 meters wide. This project includes the construction of retaining walls, sidewalks, flowerbeds, road markings, and the installation of lighting systems, which are scheduled to be completed in a fundamental and standard manner in 1405 of the solar Hijri calendar. With the completion of this road, greater conveniences will be provided for citizens traveling from the Chahal-ston route to the Kabul-Logar road, and it will also play an effective role in reducing traffic congestion on the Kabul-Logar road. Furthermore, the implementation of this project, in addition to facilitating travel for the residents of the Pedole area, will also provide the groundwork for improving the economic and social conditions of the region. #Kabul_Step_by_Step_Towards_Development Citizen, Cooperation, Municipality کندن‌کاری و هموارسازی مسیر صعب‌العبور سرک پدوله – سنگ‌نوشته ادامه دارد کارهای کندن‌کاری دامنه‌های کوه و هموارسازی مسیر صعب‌العبور سرک پدوله از غرب لیسهٔ خوشحال‌خان نمبر دو تا پروژهٔ سوم پدوله و در نهایت تا ساحهٔ سنگ‌نوشته در مربوطات نواحی هفتم و بیستم جریان دارد که این فعالیت‌ها به‌منظور آماده‌سازی مسیر برای ساخت طبقات اساسی سرک انجام می‌شوند. بر اساس طرح، بخش نخست این سرک از غرب لیسهٔ خوشحال‌خان نمبر دو تا پروژهٔ سوم پدوله به‌طول ۴۸۰ متر و عرض ۴۰ متر ساخته می‌شود و بخش دوم آن از پروژهٔ سوم پدوله تا ساحهٔ سنگ‌نوشته ۳٬۳۰۰ متر طول و ۱۵٫۳ متر عرض خواهد داشت. در این پروژه، اعمار آبروها، پیاده‌روها، گلدان‌ها، خط‌اندازی جاده و نصب سیستم تنویر نیز شامل بوده که قرار است در سال ۱۴۰۵ هجری خورشیدی به‌گونهٔ اساسی و معیاری تکمیل گردد. با تکمیل این سرک، برای شهروندانی که از مسیر چهل‌ستون به‌سرک کابل–لوگر رفت‌وآمد می‌کنند سهولت‌های بیشتر فراهم شده و در کاهش ازدحام ترافیکی سرک کابل–لوگر نیز نقش مؤثری خواهد داشت. همچنان تطبیق این پروژه افزون بر تسهیل رفت‌وآمد باشندگان ساحهٔ پدوله، زمینهٔ بهبود وضعیت اقتصادی و اجتماعی منطقه را نیز فراهم می‌سازد. ______ د پډولې - سنګ نوشتې سړک په سختو برخو کې د کیندنو او هوارولو چارې روانې دي د اوومې او شلمې ناحیې اړوند د خوشحال خان د دویم نمبر لېسې له لوېدیځ لوري څخه د کابل- لوګر تر سړک پورې د پډولې- سنګ نوشتې سړک د غره د لمنو او سختو برخو د کیندلو او هوارولو چارې روانې دي، دا کار په دې موخه ترسره کېږي څو د سړک د اساسي طبقو جوړولو ته زمینه برابره شي. د ډیزاین له مخې؛ د دې سړک لومړۍ برخه د خوشحال خان دویم نمبر لېسې له لوېدیځ لوري څخه د پډولې تر درېیمې پروژې پورې، ۴۸۰ متره اوږدوالی او ۴۰ متره سور او له یادې سیمې څخه تر سنګ نوشتې پورې ۳۳۰۰ متره اوږدوالی او ۱۵.۳ متره سور لري. په دې پروژه کې د لښتیو، پلیو لارو او ګلدانونو جوړول، په سړک د کرښو اچول، د څراغونو نصبول او د یوه معیاري سړک نور جزئیات هم شامل دي چې، چارې به یې په ۱۴۰۵ کال کې په اساسي توګه بشپړې شي. د دې سړک په جوړېدو سره به له یوې خوا د چهلستون سړک له کابل- لوګر سړک سره ونښلول شي او بله خوا به ښاریانو ته به د تګ راتګ په برخه کې ګڼې آسانتیاوې رامنځته شي. همدا راز دا پروژه د سیمو د اقتصادي ودې په برخه کې هم مهم رول لري. #کابل_ګام_په_ګام_د_آبادۍ_په_لور همشهری،همکاری، شاروالی #کابل_ښاروالۍ #شاروالی_کابل #Kabul_municipality Source: Kabul Municipality / کابل ښاروالۍ / شاروالی کابل (@KblMunicipality) [ https://x.com/KblMunicipality/status/2030992000640594159 ] #Afghanistan #Kabul #Logar