@EdwinG@mstdn.moimeme.ca The crutches are still there, and there was no point in rebuilding it at the time due to the long term project of eliminating the circle and having just an underpass under highway. (Dorval Avenue extended). As long as the crutches are holding and they don,t need to duct tape it every weekend, the priority remains to rebuild the St-Pierre interchange (A20 to Mercier Bridge). Ad that was delayed by the sudden priorioty to rebuild the Île Aux Touurtes bridge at Senneville/Vaudreuil.
Replies (1)
-
@EdwinG@mstdn.moimeme.ca 2026-09-19 21:20
@jfmezei@cosocial.ca Last I heard, the project was abandoned in the early 2020s. I can’t even find any documentation from the MTMDETQ about its reconstruction. If we had infinite money, I would shove the M20 into a tunnel in the area and put a park in its place.