Elektrine lite

← Feed

@shaunyata@thecanadian.social

2026-07-15 00:04 UTC

On July 2, the PJM power grid, which powers almost half the US, almost shut down completely a because Data Centers put too much load on the grid during the heat wave. Data Centers had to disconnect and run on their own diesel power. Every AI hyperscaler has a 'hidden ceiling' that doesn't show up on an earnings call: the limit to the amount of power on the grid. https://youtu.be/fB40h_AqYXc

Replies (0)

No replies.